Skip to content
Karp Construction IncBook estimate

ADU Construction

ADU Construction in Elk Grove & the Sacramento Area

Karp Construction designs and builds backyard ADUs and garage ADUs in Elk Grove and the Sacramento area, handling plans, permits, utilities and inspections for you. We coordinate the engineering and the city, and our crew builds it from foundation to final inspection.

CSLB #1101266 Licensed, bonded & insured 4.8★ on Google & Yelp

Backyard ADU with a covered patio in golden-hour light

What's included

What a adu construction job covers.

Backyard ADUs, detached or attached

Garage ADUs built above or beside an existing garage

Plans, engineering and city permits handled for you

Utility connections: water, sewer, electrical

Foundation, framing, roofing, siding and full interior finish

Final inspection and sign-off with the city

ADU framing
From the job file

ADU framing

A real Karp Construction project photo.

The process

From first visit to final walkthrough.

An ADU touches plans, engineering, utilities and the city. Here is how it runs with Karp.

Real projects

ADU Construction project photos

Browse adu construction projects

What you can expect

One contractor, from estimate to final inspection.

We oversee your project and coordinate the work, the trades and the city requirements.

Licensed, bonded and insured · Verify CSLB #1101266 (opens in a new tab)

A written scope and estimate

We visit your home, discuss the work with you and follow up with a written estimate, usually the next day.

We oversee the work

We coordinate our crew and licensed specialty trades, from the first walkthrough to the final inspection. You are not left to organize separate contractors.

Plans, permits and inspections

When your project needs them, Karp handles drawings, engineering, city approvals and inspections as part of the job.

Questions

ADU Construction questions

Do I need a permit for an ADU?

Yes. Every ADU needs city approval, and Karp handles the whole thing: drawings, engineering, the permit application and each inspection along the way.

How long does an ADU take?

Plan on 2 to 3 months for permitting, then anywhere from a couple of months to about six months of construction, depending on the size of the unit and your city. We lay out the timeline in the written estimate before anything starts.

Can my garage become an ADU?

Often, yes. Many Sacramento-area garages can be converted into a legal ADU with the right plans and permits. We will look at your garage at the free consultation and tell you honestly whether it is a good candidate.

Do you handle the plans and engineering?

Yes. We coordinate the drawings, structural engineering and utility planning, then shepherd the permit through the city. You approve the design; we handle the paperwork.

What happens at the first consultation?

We come to your home, walk the property with you, listen to what you want the ADU for and explains the realistic options. It takes about 30 minutes, it is free, and a written estimate usually follows the next day.

Free in-home estimate

Tell us about your project.

Start with a free in-home visit and a written estimate for your project.